Krishi Infratech since its inception has completed 18 major projects in the last 5 years. Some of these projects involving higher complexity are :
sl no | Name of Work | Agt No/LOA No Date | Value (Rs In Crores) |
---|---|---|---|
1 | Kadur - Chikkamagalur - Sakleshpur via Beluru, Proposed construction of ROB at ROB at bet. Kadur, Sakarayapatna section. | W.496/DUSR/083 Dt:28.11.2012 |
7.28 |
2 | Construction of ROB in Lieu of LC No.131 at Km.192/600-700(Sarjapur Road) between Heelalige and Carmalram Railway station. | W.496/ROB/LC-131 Dt:15.11.2012 |
18.46 |
3 | Construction of approaches on both sides of ROB in lieu of LC No.133 at Railway Km.337/400-500 between KJM-WFD Station near Hoodi. | W.496/ROB/LC133AP Dt:15.11.2012. |
10.99 |
4 | Kolar - C"Pur GC - Proposed construction of 12nos of RUB's in lieu of existing level crossing | W.496/KZCP/226 Dt:03.09.2013 |
20.43 |
5 | Construction of Road Over Bridge as Composite Steel Girder in lieu of LC No:103 between Srirangapatna-Naganahalli Stations on Banglore-Mysore section. | W.496/RMMS/125 Dt:10.06.2014 |
5.59 |
6 | Hosadurga Road - Chikjajur patch doubling work-Construction of Major bridge between Holalkere-Chikjajur. | W.496/HSD-JRU/04 Dt:17.12.2013 |
13.49 |
7 | Construction of RUB No.22 at Ch:14930 over NH-218 PSC box girder as per railways approved drawings including for Bagalakot-Kudachi new BG line | W.496/BKKD/13 Dt:17.12.2013 |
10.25 |
8 | Hosadurga Road - Chikjajur patch doubling work-Construction of Major bridges between Hosadurga Road- Holalkere Stations. | W.496/HSD-JRU/01 Dt:17.07.13 |
25.25 |
9 | Hubli - Miraj section: Proposed Costruction of approaches for ROB in lieu of LC No:385 between Belgum and Sambre stations with PSC girders | W.496/UM-ROB385/02 Dt:09-04-1514 |
14 |
10 | Yalahanka - Doddaballapur section : Construction of approaches and Limited Height Subway for Proposed Road Over Bridge at Rajankunte yard in lieu of LC ?No:21. | W.496/YNK-DBU/02 Dt:20-01-201510 |
67 |
11 | Proposed Construction of ROB at in lieu of LC No.198 bet Tolahunase and Davangere (1X24m composite girder, 11X19.40m span PSC girder) | W.496/HSD-JRU/19 Dt:16-10-201419 |
36 |
12 | Construction of Road Over Bridge of Railway span composite girder and PSC girder span of 7x30.5m + 1x15.0m slab in approaches in lieu of LC NO.4A in Yeswanthpura - Yelahanka section. | W.496/YPR-YNK/20 Dt:29.04.201427 |
21 |
13 | Kadur - Chikkamagalur new BG line - Proposed Construction of ROBs in Kadur - Chikkamagalur section. | W.496/DUSR/092 Dt:11.06.201418 |
05 |
14 | Proposed Construction Road Over Bridge in Chickjajur yard in lieu of LC No.169 between Chickjajur and Sasalu. | W.496/HSD-JRU/20 Dt:08-05-201519 |