Road Safety Measures and Curve Improvement works at Bharatipura, near Thirthahalli, on the Shimoga- Mangaluru section of NH-169 in Karnataka, executed on EPC mode.
Road Safety Measures and Curve Improvement works from Km
Construction of Proposed 2-lane ROB on EPC Mode in the state of Andhra Pradesh (2nd Call)
Construction of Proposed 2-lane ROB and Subway in Lieu
Construction of 4-lane ROB on Chittoor – Pakala railway section in the State of Andhra Pradesh on EPC basis
Construction of 4-lane ROB and its approaches in lieu
Construction of 4-lane ROB and its approaches in lieu of existing Level Crossing No. 18A/SPL on Chittoor – Pakala railway section in the State of Andhra Pradesh
Construction of 4-lane ROB and its approaches in lieu
Construction of 4-Lane ROB in lieu LC No:47 at Rly. Km 49/600-700
Construction of 4-Lane ROB in lieu LC No:47 at





